![]() |
||
|
22 September 2010
STOKVIS ENERGY SPECIFIED FOR THE
Closed for nearly three years during one of the most ambitious restorations of an iconic London landmark, The Savoy, located on the Strand is due to re-open on October 10th 2010. The project includes the total upgrading of the famous destination’s amenities including the installation of high performance heating and hot water systems featuring equipment from Stokvis Energy Systems.
The listed location is managed by Fairmont Hotel & Resorts, the rebuilding contract has been led by the Chorus Group, in conjunction with Reardon Smith Architects and internationally renowned designer Pierre-Yves-Rochon.
|
![]() |
|
|
“Our purchasing department had looked at a number of options before we got involved with the work at The Savoy, but basically we decided to proceed on the basis of their performance figures and what we were shown in other hotels across London. The ultra reliable delivery of hot water thanks to the plate heat exchangers and the boilers together was a key issue.”
In total four of the 3000 range boilers have been installed in the basement plant room, while a trio of plate heat exchangers and buffer vessels will ensure that the 268 guest bedrooms, suites and other facilities never run short of hot water. The
|
||